ANALYSIS OF COST CONTROL, TIME, AND QUALITY ON CONSTRUCTION PROJECT

Dewi Nusraningrum(1*), Joko Priyono(2),

(1) Universitas Surabaya
(2) 
(*) Corresponding Author

Abstract


This research aims to analyze the relationship of delay time and costs with estimated that causes increased costs from perspective of management fees project with earned value method and to analyze the influence of the variables associated with the quality control at each stage of the work concreting. Secondary data collection i.e. the draft budget, the curve S, financing and weekly reports the progress of the project. Primary data i.e. questionnaires to 30 respondents. The cost control and time used earned value methods, and quality control with multiple linear regression. The results of the research project performance until the 27th week of aspects of cost and time projects implementation are not experiencing excess costs, but suffered delays. Regression analysis a very influential determinant variables of each job of making concrete to install formwork: concrete level marking and dimensions for formwork, ironing: the connection reinforcement iron and iron a clean free from rust, oil, and dry concrete, for concreting: checking of slump test and the amount of labor, and to uninstall the formwork: concrete age and concrete level according to plan.

Keywords


pengendalian biaya; pengendalian waktu; earned value; mutu

Full Text:

PDF

References


Ashokkumar, D. 2014. “Study of Quality Management in Construction Industry”. International Journal of Innovative Research in Science, Engineering and Technology. February 2014, 2319-8753, Volume 3, Special Issue 1.

Aulady, Mohamad dan Cesaltino Orleans. “Perbandingan Durasi Waktu Proyek Konstruksi Antara Metode Critical Path Method (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut)”. Jurnal IPTEK. Mei 2016, 1411-7010, Vol.20 No.1.

Daulasi, Adria., Jantje B. Mangare., dan D.R.O. Walangitan. 2016. “Perbandingan Biaya Proyek Gedung Empat Lantai STKIP Kie Raha Ternate eengan Metode Earned Value”. Jurnal Sipil Statik. Februari 2016, 2337-6732 75-82, Vol.4 No.2, Hal 75-82.

Dimyati, A. Hamdan., Kadar Nurjaman. 2016. Manajemen Proyek. Pustaka Setia. Bandung.

Efendi, Ahmad dan La Ode Sumarsiddin. 2015. “Pengendalian Waktu dan Biaya pada Proyek dengan Metode Earned Value (Studi Kasus Pembangunan Dermaga Kasipute Kab.Bombana)”. Jurnal Teknik ITS. 2337-3539, Vol. 4, No. 1.

Hadiono, Budi. 2010. “Manajemen Pengendalian Mutu Pekerjaan Struktur Atas (Studi Kasus Proyek 1 @ Cik Ditiro Menteng Residence Jakarta)”. Skripsi. Jurusan Sipil. Fakultas Teknik Sipil dan Perencanaan. Universitas Mercu Buana. Jakarta.

Pinontoan, Danny Maximilian Mitchel., R J M Mandagi., dan Jantje Mangare. 2015. “Pengendalian Biaya dan Waktu Dengan Metode Analisis Nilai dan Hasil dengan Microsoft Project 2010 (Studi Kasus : Gedung Mantos Tahap III)” . Jurnal Sipil Statik. Desember 2015, : 2337-6732, Vol.3 No.12, 787-803.

Rantung, H P Audy., Bonny F Sompie., dan Robert J. M. Mandagi. 2014. “Analisis Pengendalian Biaya dan Jadwal pada Tahap Pelaksanaan Konstruksi dengan Analisis Nilai Hasil (Earned Value Analysis) Studi Kasus pada Proyek Bangunan Pengaman Pantai di Provinsi Sulawesi Utara”. Jurnal Ilmiah Media Engineering. November 2014, 2087-9334, Vol.4 No.3.

Rivelino. 2016. “Kajian Pengendalian Mutu Konstruksi pada Pengawasan Pelaksanaan Pembangunan Jaringan Irigasi Studi Kasus: Pembangunan Jaringan Irigasi di. Leuwigoong”. Jurnal Konstruksia. Desember 2016, Volume 8 Nomer 1.

Rustendi, Iwan. 2012.” Aplikasi Statistical Process Control (SPC) dalam Pengendalian Variabilitas Kuat Tekan Beton”. Teodolita. Juni 2012, Vol. 14, No. 1 Hal. 16-36.

Santosa, Made Arya Wira. 2013. “Penerapan Standar Sistem Manajemen Mutu (ISO) 9001:2008 pada Kontraktor PT. Tunas Jaya Sanur”. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil. Pebruari 2013, Volume 2, No. 1.

Simanjuntak, Ronald A Manlian dan Imam Firmansyah. 2014. “Rekomendasi Hasil Analisis Waktu Pelaksanaan Konstruksi Bangunan Gedung Pemerintah Di Lingkungan Kota Serang Provinsi Banten”. Jurnal Ilmiah Media Engineering. Desember 2014, 2087-9334 Vol.4 No.4, 219-228.

Ghozali, Imam. 2014. “Aplikasi Analisis Multivariate Dengan Program IBM SPSS 21 Update PLS Regresi Edisi 7”. BP Universitas Dipenogoro.




DOI: https://doi.org/10.24123/jmb.v17i1.364

Article Metrics

Abstract view : 2416 times
PDF - 624 times

Refbacks

  • There are currently no refbacks.




Copyright (c) 2019 Journal of Management and Business



Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License. ISSN: 1412-3789. e-ISSN: 2477-1783.

Google ScholarGoogle ScholarGARUDA - Garba Rujukan Digital
DOAJ
ROADROADEBSCO
mabis statistics